Challenge

Tri-Delta Plastics needed to install a new cooling tower. Statewide Mechanical was hired to install the new cooling tower for the facility. The customer needed to set-up and do as much work around the existing mechanical devices so that normal operations could continue. Quality 1st Contracting was contacted by Statewide Mechanical to ensure that the footing would be able to be installed and that the facility could continue operating during this time.Quality 1st Contracting installed four (4) 18” x 3’ sonotube footings for a new cooling tower installation. The job was completed in one day, which allowed to next stage of the work to be completed as soon as possible. Once the footings were set the plant could prepare to have items shut down to quickly install the cooling tower.

Serving NJ including the Greater Newark area
Our New Jersey Service Area

Click for the BBB Business Review of this Waterproofing Contractors in Perth Amboy NJ

Before & After
Sign Up for Our Newsletter